Supplier Quality Clauses
HQA-01
1.) Quality System
Supplier shall maintain a quality system that meets or exceeds MIL-I-45208,
ISO 9001, ISO 9002 or AS9100. All references in MIL-I-45208 to Government
or Government Representative apply equally to Harlow Aerostrutures or
Harlows Representative. All references in MIL-I-45208 to contractor
apply to Supplier. All references in Mil-I-45208 to contract apply to
Harlows purchase order or contract with the supplier. Suppliers
quality system is subject to review and approval by Harlows Quality
Assurance, Harlows Customers, and any agency (government, industry
or private; foreign or domestic) which has oversight authority over Harlow
or Harlows Customers.
2.) Certificate of Compliance
Each shipment shall contain a certificate of compliance that the product
meets the requirements of the engineering and purchase order. An authorized
representative of the suppliers quality organization must sign this
certificate. The certificate must contain the revision level of all engineering
documents or specifications that apply to the work performed by the supplier
or the suppliers subcontractor. When the purchase order does not
specify the revision level of the engineering or specification, the latest
engineering or specification shall apply.
Supplier shall provide a copy of all certificates of compliance from
suppliers subcontractor when the subcontractors work is controlled
by Clause 3, 4, or 5.
Where supplier manufactures parts for Harlow Aerostrutures and then applies
finishes (plating, painting, etc. either by sub-tier or in-house) the
supplier shall perform a 100% Rockwell and Conductivity, as applicable,
inspection of the parts prior to application of the finishes. Such Rockwell
and Conductivity shall be performed per specifications required by Harlows
customer. Supplier shall provide written certification of 100% Rockwell
and Conductivity, including actual upper and lower readings and specification
(including revision level) to which Rockwell and Conductivity inspection
was performed.
Where Harlow Aerostrutures supplies the material for this order, the
supplier shall certify on each shipment that the supplier has not made
any unauthorized substitutions of the material. Harlows Quality
Assurance must approve any substitution of material. Harlow will conduct
100% Rockwell and Conductivity inspection, as applicable, on parts directly
contracted to thermal processing suppliers. Harlow inspection shall
not be construed as relief to the processing supplier to perform as required
to the specification(s).
3.) Special Processing
If this order is for production work that includes special processes,
the supplier shall use only those processors approved by Harlow
customer for that process. Supplier should contact Harlow Quality
Assurance for assistance in assuring that supplier uses only approved
processors. Original processor certification must be retained on file
and traceable to end item products delivered to Harlow Aerostrutures.
Note: All items delivered to Harlow Aerostrutures must maintain Job/Lot
traceability.
4.) Raw Materials
Where the supplier supplies raw material (e.g., bar, castings, extrusion,
forging, plate, sheet, etc.) either directly to Harlow Aerostrutures or
purchases the material for use in manufacturer of machined or sheet metal
products for Harlow Aerostrutures (standard hardware items are specifically
excluded from this paragraph), the supplier shall assure that the material
is manufactured and distributed by sources approved by Harlows customer.
Raw material test reports and/or notarized reports, in accordance with
all applicable specifications, must be kept on file and traceable to end
item products delivered to Harlow Aerostrutures.
Note: All items delivered to Harlow Aerostrutures must maintain Job/Lot
traceability.
Where our customer does not specifically require approval of the manufacturer
and/or distributor of the raw material then:
Where the material is for use on commercial aircraft the supplier shall
assure that the material is manufactured in the United States of America
or in a country with which the United States of America has ratified a
Bi-Lateral Airworthiness Treaty. For a list of countries with bi-lateral
agreements consult FAA AC 21-18 and AC 21-23.
Where the material is for use on military aircraft and the material is
considered a specialty metal (as defined in DFARS 252.225-7014), then
the supplier shall assure that the materials are melted in the United
States of America, its possession, or Puerto Rico unless supplier gains
prior written approval through Harlow Aerostrutures from our customer
for use of other sources.
Certificate of compliance with actual results of physical and chemical
test reports must accompany each shipment where supplier furnishes the
raw material. Material must be identified by heat lot and or heat treat
load, (if applicable). Test reports must be traceable to the material
lots supplied.
Supplier should contact Harlows Quality Assurance for assistance
in assuring the source of raw material supply is acceptable to Harlows
customers.
5.) Standard Hardware Items
Where the supplier supplies hardware items (e.g., Bolts, Nuts, Nutplates,
Rivets, Loc Bolts, Hi-Locs, Collars, etc.) of standard design (whether
industry or Harlows customer standard) and the hardware is controlled
by a qualified producers list (QPL) the supplier shall provide a
certificate of source of supply when the direct Harlows supplier
is not on the QPL.
Where Harlows customer requires the distributor to be approved,
then the supplier shall only use and or supply hardware from Harlows
customer approved distributor.
Supplier shall provide a certificate of suppliers source of supply
where the product is controlled by a qualified producers list (QPL)
when the supplier is not on the QPL.
Supplier should contact Harlows Quality Assurance for assistance
in assuring the source of standard hardware items is acceptable to Harlows
customers.
6.) First Article Inspection Report
For production work done to designs and/or specifications furnished
by Harlow Aerostrutures, the supplier will provide a First Article Inspection
Report in the following situations:
A. For all first production lot.
B. First production lot after engineering changes and/or changes to manufacturing
processes that may affects conformance to design. In most cases, the First
Article Inspection Report need only record those features changed.
At the minimum a First Article inspection report must include the part
number, a listing of each engineering feature, a listing of the actual
measurement of each engineering feature and a record of the person who
inspected that engineering feature. Suppliers are required to use SAE
AS9102 First Article Inspection Report Form.
7.) Non-Conforming Material Control
Supplier shall submit all nonconforming material to Harlows Quality
Assurance for approval prior to shipping of the product. The supplier
may use Harlows documents or suppliers documents to identify
discrepant material.
Supplier shall investigate the cause of each nonconformance, whether
identified by supplier or by Harlow Aerostructures. The supplier shall
establish corrective action to preclude the recurrence of the nonconformance.
The supplier shall provide a statement of the cause and the corrective
action to Harlows Quality Assurance whenever the supplier is submitting
a nonconformance for Harlows approval. The supplier shall provide
a statement of the cause and the corrective action to Harlows Quality
Assurance within ten days whenever Harlow has identified a nonconformance
to the supplier.
If any part of this Purchase Order is defective in design or workmanship
or otherwise not in conformity with the requirements of this Purchase
Order, Harlow Aerostrutures may elect in its sole and reasonable discretion
to: (a) return the nonconforming parts for replacement (b) to cause Supplier
to rework or repair the nonconforming parts; (c) rework or repair the
nonconforming parts and recover reasonable expenses of rework or repair
from Supplier, or in the event Supplier is unable to remedy the nonconforming
condition, Harlow Aerostrutures reserves the right to reject and return
the nonconforming parts, not to be replaced and with full refund of all
costs paid by Harlow Aerostrutures, Inc. for the parts (without any deductions
by Supplier). All nonconforming part returned by Harlow Aerostrutures
to the Supplier and all replacement parts shipped to Harlow to replace
nonconforming part, shall be at Suppliers risk and expense, including
transportation charges.
8.) Statistical Process Control
Suppliers (other than distributors) must have SPC fully implemented if
applicable and approved by Harlow Aerostrutures. Contact Harlows
Quality department to discuss plans and implementation.
If supplier has an SPC plan approved by Harlows customer, then
supplier shall provide evidence of the SPC approval to Harlows Quality
department.
For all shipments made after suppliers SPC plan is approved, supplier
shall retain all SPC charts on file for Harlows review. Supplier
shall provide copies of these charts upon request.
9.) Record Retention
Supplier shall retain records on file a minimum of ten years from the
date of shipment.
10.) Option to Reschedule
Harlow Aerostrutures shall have the option to re-schedule by written
notice, in whole or in part, this order. If Harlow exercises the option
to re-schedule, Supplier shall not incur any additional costs in connection
with the agreement after receipt of notification. Harlow Aerostrutures
agrees that we will promptly negotiate an equitable adjustment with Supplier,
including compensation for actual cost completed up to the re-scheduling
provided that it receives a claim for adjustment in writing, specifying
the amount claimed with supporting cost figures within thirty (30) days
from the date of receipt by Supplier of the notification of the exercise
of the option. The amount claimed shall not exceed 10% per year herein
less Suppliers charges for Suppliers performance to complete.
Supplier acknowledges that the amount specified in any claim for adjustment
shall, in all cases, constitute the maximum due from Harlow Aerostrutures
to Supplier under this agreement.
11.) Government Contract
Provisions of the defense priorities and allocations system regulations
15CFR700 apply. Rated orders with national defense priority Classification,
(This is a DO-A1 rated order).
12.) Shipments, Deliveries and Packaging
Harlow Aerostructures. reserves the right to reject or return at Suppliers
risk and expense shipments made in advance of requirement schedules,
or to defer payment on advance deliveries until scheduled delivery dates.
No over shipments accepted without prior approval in writing. (Harlows
shipping window is +7 days/-0 days.) No charge will be paid by Harlow
Aerostructures. for packing, boxing, or cartage unless specified on the
face hereof. Loss of or damage to any goods not packed in such a manner
as to insure proper protection to same shall be borne by Supplier. Each
package of goods shipped must contain a memorandum showing suppliers
name, contents of package and the purchase order number on the face thereof.
Title and risk of loss and damage to material purchased hereunder by Harlow
Aerostructures. shall vest to Harlow Aerostructures. when the material
has been delivered at the F.O.B. point.
13.) Right of Access and Right to Inspect
at Source
Harlow Aerostrutures/customer and associated with government agencies
reserve the right of access to suppliers facilities to witness or otherwise
monitor progress in completion of this purchase order. This right of access
shall include, but not be limited to, the right to inspect any or all
work performed under this order. Harlows Quality Assurance will
notify the supplier, in advance of shipping date, if Harlow Aerostrutures/customer
source inspection is required.
Special Clauses
A. Limited Shelf Lifetime
This order is for a limited shelf life item. Supplier shall identify
the container, package and packing sheet as follows:
Governing Specification
Name of Manufacturer
Date of manufacture (cure date for elastomers)
Batch Number/Net Contents (as applicable)
Storage Requirements (e.g., temperature, etc.)
Expiration date
B. Source Inspection
1. Harlows acceptance is required prior to shipment. Notify Harlows
Quality Assurance at least 48 hours before shipment. Call (316) 265-5268
between the hours of 8:00 a.m. and 3:30 p.m., Wichita local time (Central
Time Zone), to notify Harlow of items ready for source inspection.
2. Harlows customer inspection acceptance is required prior to
shipment of this order. Upon receipt of this order, supplier shall contact
Harlows Quality Assurance to coordinate and plan our customers
inspection.
3. Government inspection is required prior to shipment from your plant.
Upon receipt of this order, promptly notify the Government Representative
who normally services your plant so that appropriate planning for Government
inspection can be accomplished.
4. On receipt of this order, promptly furnish a copy to the Government
Representative who normally services your plant or, if none, to the nearest
Army, Navy, Air Force, or Defense Supply Agency Inspection Office. In
the event the representative or office cannot be located, Harlows
Quality Assurance should be notified.
C. Boeing D-6 1276 Approved Manufacturing Plans
Boeings D6-1276 document applies to this order. All manufacturing
plans for this order must meet the requirements of D6-1276. Supplier must
submit the detailed manufacturing plans to Harlows Quality Assurance.
Harlow will submit the manufacturing plan to Boeing for approval. Manufacturing
plans must be approved prior to supplier beginning work on this order.
D. First Part Approval Required
Supplier shall submit first part to Harlows Quality Assurance for
inspection acceptance prior to running the production of parts on this
order. Harlow Aerostrutures will provide supplier with an inspection report
stating the findings of our inspector. All nonconforming issues raised
by Harlows Quality Assurance must be corrected before production
of parts on this order.
E. Certification of Ozone Depleting Substances
Supplier must provide one of the following certifications on each shipping
document:
- The supplier certifies these goods were not manufactured with and do
not contain ozone depleting substances.
- The Supplier certifies these goods are in compliance with the ozone depleting
substances labeling requirements under US law.
If certification to paragraph B is made, precautionary labeling must
accompany the statement and must comply with 40 CFT Part 82 Subpart E.
F. Approved Manufacturing Plan
Prior to beginning production on this order supplier must provide and
obtain Harlows Quality Assurance Approval of the manufacturing plan.
The plan must include the raw material required for manufacture (by alloy,
temper and specification), detail of the manufacturing process, define
the special processes and identify the sub-tier suppliers (by name and
complete address) who are to perform the special process. All specifications
noted in the manufacturing plan must be to the current applicable revision
level as of the date of placement of this order, unless otherwise specified
in the purchase order.
G. Certification of Calibration
This order is for calibration services. Each gauge calibrated for Harlow
Aerostrutures must be accompanied with a Calibration Certification. The
following is the minimum information that must be included on the Calibration
Certification.
- Harlow Aerostrutures gauge serial number and description.
- Date of the calibration.
- Serial Number of the Master you used for calibration of Harlow’s gauge.
- Last calibration date and next calibration due date of the Master used.
- NIST date, trace number or foreign equivalent
- Statement that the calibration meets one of the following calibration system standards; ANSI/NCSL Z540-1, ISO 10012-1, OR MIL-STD-45662A. ANSI/NCSL Z540-1 is the most preferred calibration system to Harlow Aerostrutures. ISO 10012-1 is second preferred. MIL-STD-45662A is least preferred.
- Actual signature or identifying inspection stamp of the person who is certifying the calibration.
|